Do you need a permit for a retaining wall in Hot Springs, AR?

Usually yes, and who issues the retaining wall permit depends on where the lot sits. Inside Hot Springs, an unloaded wall up to 4 feet from footing to top skips the building permit. It still needs an Engineering Department permit. Hot Springs Village requires a POA permit. On Lake Hamilton and Lake Catherine, all wall work needs Entergy’s permit.

Who issues a retaining wall permit around Hot Springs?

Who signs off on a retaining wall depends on where the lot sits. A city lot, a Village lot, a county lot and a lake lot each answer to a different office. Scott Bankhead Demolition builds large segmental block retaining walls around Hot Springs. The permit question comes before the first block goes down.

What each wall type costs is in the retaining wall cost guide.

Where the lot sitsWho issues the permitWhat triggers itContact
Hot Springs city limitsCity Engineering Department; the Building and Permits Division for taller wallsWalls up to 4 feet from the footing need the Engineering Department permit. Taller walls, or walls holding up a load, need a building permitBuilding and Permits Division, 501-321-6851
Within one mile of the Hot Springs limitsCity of Hot Springs permits may applyCheck with the city before assuming county rulesBuilding and Permits Division, 501-321-6851
Hot Springs VillagePOA Permitting and InspectionsNew walls and changes to existing walls501-922-5562
Unincorporated Garland CountyGarland County Floodplain Administrator; no county building permitNew construction. A stormwater plan for any platted subdivision lot, or more than 1 and under 5 acres disturbedFloodplain Administrator, (501) 767-3911
Lake Hamilton or Lake Catherine shorelineEntergy Shoreline Management, plus Corps General Permit 60All wall work and bank stabilization, repairs includedLakePermits@entergy.com or 501-844-2197
Lake Ouachita or DeGray Lake, on Corps landCorps of Engineers lake field officeErosion control needs a Shoreline Use Permit. Grading or fill needs a lease or other real estate grantLake Ouachita 501-767-2101; DeGray Lake 870-246-5501
BentonCity of Benton Community DevelopmentAll new, repaired or modified residential retaining walls; engineer design over 4 feetCommunity Development, through the retaining wall application
Bryant, Malvern or ArkadelphiaCity planning or building officeNo published retaining wall rule found; call firstBryant 501-943-0488; Malvern 501-332-3638, option 2; Arkadelphia 870-246-9864

Wherever the lot sits, state law requires a call to Arkansas 811 before any digging. Dial 811 or 1-800-482-8998.

What does the City of Hot Springs require for a retaining wall?

Inside the city, retaining walls not over 4 feet skip the building permit. Height runs from the bottom of the footing to the top of the wall. A wall supporting a surcharge, such as a driveway above it, loses that exemption. Exempt walls still need a permit from the city Engineering Department.

Digging needs its own permit. The city’s grading code bars excavation or grading without first having obtained a permit from the city engineer. Small jobs can be exempt, such as a cut less than 2 feet deep. The grading permit fees are in the Hot Springs demolition permit guide.

The same code sets an engineer line. Any retaining wall more than 4 feet tall must be designed by a registered professional engineer. That engineer also inspects the wall in the field. The city engineer may require the same for walls under 4 feet.

Two more city rules matter on tight lots. Grading plans need an Arkansas registered civil engineer’s stamp in some cases. One is a cut or fill over 4 feet within 10 feet of a property line. Safety railings may be required on any retaining wall 2.5 feet or higher.

The state residential code adds its own lines. Walls not braced at the top that retain more than 48 inches of fill must be designed. So must walls over 24 inches that hold back a load besides soil. The design uses a safety factor of 1.5.

A block maker’s height chart is reference only. Final designs go to a local registered professional engineer working from the real site.

Scott Bankhead Demolition handles the grading and site prep around a new wall. How the blocks compare on weight and gravity wall height is in the retaining wall blocks guide.

What does Hot Springs Village require for a retaining wall?

Hot Springs Village runs its own permit desk through the Property Owners Association. The POA’s architectural control policy lists retaining walls among its required permits. Permits are required for new projects and modifications to existing installations. Rebuilding or extending an old wall counts.

Permitting and Inspections answers at 501-922-5562. The Architectural Control Committee reviews permits case by case and at times issues variances. New structures and renovations must meet the current codes that apply, including the International Residential Code.

Skipping the permit carries a penalty. Under the POA policy, unpermitted changes to a building, structure or land are subject to fines. Removal or modification can follow committee review.

Village lake lots add a step. Seawalls and riprap sit on the POA’s special permit list, separate from retaining walls. See retaining walls and dirt work in Hot Springs Village for the work done inside the gates.

What applies to a retaining wall outside the city limits in Garland County?

Unincorporated Garland County generally has no building codes and issues no building permits. Still, City of Hot Springs permits may be required in the one-mile extraterritorial area around the city.

The county does require a floodplain permit for new construction. Applications go through the Garland County Floodplain Administrator as a conditional development permit. If the lot does not affect a flood hazard area, an exemption may be issued instead. The permit is free; call (501) 767-3911.

Larger jobs and subdivision lots add a stormwater permit. Work disturbing more than one acre but less than five in unplatted areas needs a stormwater pollution prevention plan. So does work on any lot in a platted subdivision. Questions about soil disturbance and runoff go to the Environmental Inspections Division at (501) 609-9067.

Private rules can still apply where the county is silent. A bill of assurance or restrictive covenants may limit what you build. The Circuit Clerk’s office searches land restrictions at (501) 622-3630.

What does a wall on Lake Hamilton or Lake Catherine need?

Lake Hamilton and Lake Catherine are Entergy Arkansas lakes, part of FERC Project 271. All wall work and bank stabilization projects require an approved permit from Entergy Shoreline Management. Entergy’s FAQ says any wall failure needs one, even restacking blocks on an existing footer. Power washing, painting or tuck-pointing missing mortar does not.

Your deed may stop short of the water. Entergy holds rights to the lakebed and some land above the shoreline. Building there takes its permission.

Seawalls are allowed only along shorelines Entergy’s plan designates General Use. Riprap is required in front of every new seawall and seawall repair, up to the water. The wall top cannot sit above 403 feet on Lake Hamilton or 307 feet on Lake Catherine. That is typically 3 feet above normal summer lake level.

Walls follow the normal shoreline, 399.7 feet on Lake Hamilton and 304 feet on Lake Catherine. Concrete block walls should be filled with concrete and reinforced with rebar every other cell. Crossties or timbers treated with penta or creosote are not allowed. Backfill goes in after the wall and must come from an upland source.

Plan the calendar early. Bank stabilization applications typically take at least 60 days. For work during the winter drawdown, the application deadline is November 30. Ground-disturbing work also goes to the State Historic Preservation Office and the Caddo Indian Tribe for a 30-day review.

The Corps of Engineers regulates walls too, at or below 400 feet on Lake Hamilton and 304 on Lake Catherine. Most of that work falls under a general permit. Entergy’s permit ties shoreline wall work to Corps General Permit 60.

The lakefront property owner signs the application. Drawings do not have to be prepared by an engineer. Entergy’s fee schedule lists $550 for seawalls, new or modified. Riprap along an existing retaining wall carries no processing fee but still needs an application. Questions go to LakePermits@entergy.com or 501-844-2197.

What about a wall on Lake Ouachita or DeGray Lake?

Lake Ouachita and DeGray Lake are Corps of Engineers lakes. At Lake Ouachita, yellow paint blazes on trees mark the Corps property line. Work on the Corps side falls under the federal shoreline rule, 36 CFR 327.30.

Under that rule, erosion control is authorized by a Shoreline Use Permit. Grading, cuts, fills or other changes in land form need a real estate instrument, such as a lease. A shoreline permit conveys no real estate rights. It is non-transferable and ends when the permitted facility is sold.

Start with the field office before any machine moves. Lake Ouachita permit requests go to the Lake Ouachita Field Office, 1424 Blakely Dam Road in Royal. That office answers questions at 501-767-2101. For DeGray Lake, call the DeGray Lake Field Office in Arkadelphia at 870-246-5501.

What do Benton, Bryant, Malvern and Arkadelphia require?

Benton publishes a full retaining wall application. It covers all new, repaired or modified residential retaining walls and steep slopes. Walls or steep slopes over 4 feet must be designed and certified by an engineer. Repairs and replacements need a permit and a drawing, with no fee.

Benton’s placement rules matter on small lots. Walls stay at least 5 feet from side and back property lines and out of utility easements. No wall over 30 inches may sit in the clear view zone at street intersections. Tiered walls should sit as far apart as the tallest wall is high.

When the wall is done, Community Development makes a final inspection and issues a certificate of compliance.

We found no published retaining wall rule for Bryant, Malvern or Arkadelphia. Call before the wall goes in. Bryant Planning and Development is at 501-943-0488. Malvern’s building permit line is 501-332-3638, option 2. Arkadelphia’s Building Department is at 870-246-9864.

Scott Bankhead Demolition builds large segmental block retaining walls around Hot Springs and gives free on-site estimates. Call (501) 617-1511 or reach us through the contact page.

Frequently asked questions

Do I need a permit to repair a retaining wall?
Often, yes. Benton requires a permit and a drawing to repair or replace a retaining wall, with no fee. Hot Springs Village permits cover changes to existing installations. On Lake Hamilton and Lake Catherine, any wall failure needs an Entergy permit, even restacking blocks on an old footer. Power washing, painting or tuck-pointing mortar does not.
How long does an Entergy lake wall permit take?
Entergy says bank stabilization applications typically take at least 60 days. Ground-disturbing work also goes to the State Historic Preservation Office and the Caddo Indian Tribe for a 30-day review. Sites are inspected during the winter drawdown. For work during the drawdown, the application deadline is November 30, so file early.
Does Garland County require a permit for a retaining wall?
Garland County generally issues no building permits outside city limits. It does require a floodplain permit for new construction, and that permit is free. Call the Floodplain Administrator at (501) 767-3911. Work on any platted subdivision lot needs a stormwater plan. City permits can also reach one mile past the Hot Springs limits.
Who has to design a retaining wall over 4 feet in Hot Springs?
Under the city grading code, any retaining wall over 4 feet tall must be designed by a registered professional engineer. That engineer also inspects it in the field. The city engineer may require the same for shorter walls. The state residential code also calls for design on walls over 24 inches that hold back a load besides soil.
What happens if I build a retaining wall without a permit?
In Hot Springs Village, unpermitted changes to a building, structure or land are subject to fines. Removal or modification can follow committee review. On Lake Hamilton and Lake Catherine, work permitted after the fact pays twice the regular Entergy fee. Entergy acts to see that an unpermitted shoreline facility is either permitted or removed.
Do I need to call 811 before building a retaining wall?
Yes. Arkansas law requires a call to Arkansas 811 before any digging or demolishing work. Dial 811 or 1-800-482-8998. Member utilities mark their lines within two full working days. The ticket gives you ten working days from the day it was called in to start the work.
Can a retaining wall go on Corps land at Lake Ouachita?
Only with Corps approval. On Corps lakes, erosion control is authorized by a Shoreline Use Permit. Grading, cuts or fills need a lease or other real estate grant. The permit grants no real estate rights and ends when the permitted facility is sold. Start with the Lake Ouachita Field Office at 501-767-2101.
Ready to Start Your Project?

Get In Touch With Scott Bankhead Demolition

A house that needs to come down, a lot that needs clearing, a slope that needs a wall? Call or send the form and we will look at the job with you and give you a free quote, teardown through cleanup, from one company.

Get a Free Estimate

Tell us about your project and we will get right back to you.

Call (501) 617-1511